Some Progress
Nearly done with the master bath update, I'll post pictures soon. It's not quite photo ready, but I'm really proud of the progress we've made.
I'll be finishing up our outdoor seating cushions tomorrow night and starting on the slipcovers for our dining chairs then (hopefully!) too. I've never done slips before so this should be a new and interesting challenge.
Can't wait for the weekend, only 5 days left.
Dining Room:
1. Finalize table and purchase
2. Paint trim
3. Decide on plantation shutters (purchase and install)
Main Hallway:
1. Paint front door and hang knocker
2. Wallpaper downstairs closet
3. Repair crack in ceiling and on stair edge
4. Paint ceiling in hallway and above staircase
5. Paint walls in hallway and in staircase
6. Paint trim
7. Hang new art in upstairs hall
8. Wallpaper upstairs closet
Half Bathroom:
1. Hang art
2. Accessorize white bureau
3. Install glass shelf
4. Shutters
5. Fix bureau handles
Laundry Room:
1. Hang new shelves
2. Switch out light fixture
3. Paint laundry room
4. Buy new runner
5. Find art for laundry room
Master Bathroom:
1. Buy train rack for bathroom and install
2. Switch art to window wall
3. Paint closet
4. Buy shelving and install
5. Purchase new canvas/wicker baskets for storage
6. Purchase new laundry hamper
7. Install second towel hook on closet wall
8. Get new vase for plant
Kitchen:
1. Faucet
2. Accessories
3. Entry wall
4. Caulk doorway and repaint
5. Switch out fixture over table
6. Fix pendant over the sink